Neighborhoods

Up to 1,200 Homes Proposed at Moody Lake Off West Arrowood Road, With a Lake Trail and Fewer Trips Than Today's Zoning Allows

A rezoning request for 46 acres at 3211 W. Arrowood Road in southwest Charlotte would allow up to 1,200 homes, 50,000 square feet of shops, and a trail around Moody Lake. It is a request, not an approval, and no public hearing is scheduled yet.

A big residential plan is taking shape in southwest Charlotte, between West Arrowood Road and I-485. Rezoning Petition 2026-062 asks the city to let a developer build up to 1,200 homes and up to 50,000 square feet of commercial space on about 46 acres around Moody Lake.

This is a request. The city lists it as pending, and its public hearing, committee review, and council decision dates are all still unscheduled.

Where it is

The site is at 3211 W. Arrowood Road, west of West Arrowood Road, east of I-485, and south of Savoy Corporate Drive, near the Whitehall Corporate Center office park. The petitioner is AAC Moody Lake Land, LLC, and the property owner is listed as Whitehall Corporate Center, LLC, on the revised site plan filed Oct. 12. It sits in City Council District 3.

The land is zoned today for mixed use (MUDD-O) with an airport noise disclosure overlay. The request would change it to CAC-1(CD), a conditional community activity center district, meaning the site plan's conditions would become binding if approved.

What is proposed

According to the revised site plan:

  • Up to 80 for-sale attached homes, such as townhomes.
  • Up to 720 mixed-income apartments and up to 400 market-rate apartments in stacked buildings.
  • Up to 50,000 square feet of commercial or community hub space.
  • Two phases: the first would include all 80 for-sale homes and 800 apartments; the second would add up to 320 mixed-income apartments and the commercial space.
  • Open space: about 5.96 acres, or 15% of the site, above the 10% required, with at least a quarter of the required open space open to the public.
  • A 12-foot trail planned around the full edge of Moody Lake, with 1,250 of its roughly 2,750 feet inside this rezoning.

The affordability commitments

The plan includes voluntary affordability commitments:

  • 20% of the 80 for-sale homes would be sold to households earning 80% of the area median income or less.
  • 15% of the mixed-income apartments would be rent restricted for households earning 80% to 110% of area median income, for at least 15 years.

Roads and traffic

The site plan commits to rebuilding the West Arrowood Road frontage as a four-lane-plus boulevard with a planting strip and a 12-foot shared use path, extending Savoy Corporate Drive, and setting aside right of way for a future Arrowood and Whitehall connector, including the approach to a future bridge to be built by others.

One detail stands out in the city transportation department's Sept. 24 review. CDOT estimates the land's current zoning could generate about 22,987 daily trips if fully built, compared with about 8,324 under this proposal, because the request swaps a heavy commercial entitlement for mostly housing. CDOT also says a traffic impact study is required and that the public hearing will not be scheduled until the department approves it.

Why it matters

The Arrowood and South Tryon area already sees steady growth, and a project this size would add a large number of new apartments and townhomes near I-485 and the office parks around Whitehall. For nearby residents, the questions to watch are the traffic study's findings, the timing of the road work, and how the lake trail connects to the surrounding area.

What happens next and how to follow it

  1. CDOT reviews the traffic impact study.
  2. The city schedules a public hearing before City Council, where residents can speak.
  3. The Zoning Committee makes a recommendation, and Council votes.

Plans can change at every step, and an approval would not guarantee construction or a timeline. You can track documents and dates on the petition page, and the city lists a rezoning planner contact there for questions.

Last verified October 29, 2026.

Sources

  1. City of Charlotte, Rezoning Petition 2026-062
  2. Revised site plan, Oct. 12, 2026
  3. CDOT review comments, Sept. 24, 2026

Topics:Development